We’re pleased to announce that part number DD101 LONG LEAD with NSN 5910006788157 is now available in our ready-to-ship inventory. Manufactured by Crl Components Inc having CAGE Code 71590 under FSC 5910 Capacitors, DD101 LONG LEAD part is a Capacitor Fixed Ceramic Dielectr. Are you interested in a quick quote for DD101 LONG LEAD part? All you have to do is fill in the RFQ form below with your information, and we will take care of the rest. A dedicated sales representative will respond to your RFQ by email or by phone within 15 minutes of receiving this form.
Part Number: DD101 LONG LEAD | NSN: 5910-00-678-8157 (5910006788157) | Item Name: Capacitor Fixed Ceramic Dielectr | NIIN : 006788157 | |
CAGE Code: 71590 | FSC: 5910 Capacitors | FSG: 59 Electrical and Electronic Equipment Components | Category: NSN | |
Qty Available: 2869 | Description: Capacitor Fixed Ceramic Dielectr | Manufacturer: Crl Components Inc | Last Updated: 05-22-2025 | Country: USA |
NCB Code: 00 | INC Code: 00007 | |||
Your quote will be calculated based on your answers to asterisk-marked (*) fields such as Needs Parts By and Quantity (ea), so be sure to fill them out as best and as thorough as possible. ASAP Aviation Stock, owned and operated by ASAP Semiconductor, is a leading supplier of NSN parts - with more than 2 billion NSNs in stock.
We are an AS9120B, ISO 9001:2015, and FAA 0056B accredited company and have several warehouses full of ready-to-ship parts in key locations across the US and Canada. This allows us to fulfill AOG requirements in a timely manner with ease. Need to meet your requirements ASAP? No problem, we offer same day shipping and next day shipping on qualifying items.
The National Stock Number, also known as NSN, is recognized and utilized as a cataloging system for procuring, stocking, and issuing items by all members of the North Atlantic Treaty Organization (NATO) and the United States’ Department of Defense (DoD). To learn more about DD101 LONG LEAD part with NSN 5910006788157, call us at our toll-free number +1-714-705-4780, or email us at sales@asapaviationstock.com.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item Description: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
M048-101-00-3 | 1 | 2 | 5 |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES, RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE, AI-TO-AIR, PHOEB=NIX (AIM-54); TELETYPE, MODEL 28; TEST CONSOLES, MINI-SACE; ENGINE, AIRCRAFT TF33-PW-102 (C-135E, EC-135H/K/P); MISSILE, AIR-TO-AIR, SPARROW (AIM-7); SUPPORT EQUIPMENT, MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT, B- |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/+22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
2010000011565 | 3010000016187 |
1510010879129 | 4010000019590 |
5110000122252 | 6010012320400 |
7010003227140 | 8150014633182 |
1510001240914 | 1510000808414 |
View All |
Low Price Warrantied inventory at competitive prices
Find it fast Search the world's largest inventory of electronic components by manufacturer, category or part number
Quality guaranteed We sell only warrantied and traceable parts
Get it fast All inventory ready to ship from our sellers
Remember That If You Need Any Kind of Aviation Parts, Just Click On The "Request For Quote" Button and Fill The Simple Form.
Request for Quote